Project Overview
 
bar
 

BMA Coal - Stacker Conveyor 4000tph before Relocation

 

BMA Coal - Overland Conveyor 4000tph During Construction

 

BMA Coal

This project was a “brown fields” plant modification to enable the relocation existing longwall mining
plant from Crinum underground mine to Crinum East “High Wall” mine.

Fraser Osborn scope included:
Design and specification of 4km by 4000 tonne per hour overland conveyor, design of foundations,
transfer chutes and associated structures for relocation of 30 metre high stockpiling conveyor,
design of extension of reclaim tunnel, design of breaker station and rejects system.

Project Value $A33M.