Project Overview
bar

Osborne Mine

Scoping study and capital cost estimate for Site storage building and rail loading facility plus train
unloading and conveying, storage and reclamation system for 1 Mtpa magnetite project.

bar

BHP Billiton GEMCO

Projects undertaken since 1986 include:

Structural designs, fuel farm upgrade, quarry dewatering, tails dam and decant tower design,
dump station upgrades, design of mobile reclaim hopper car, concentrator modifications, conveyor
designs and modifications, sand tails disposal procedure, water reclamation from tailings dams,
provision of on site engineer, studies for increased capacity of crusher station.

bar

Cape Flattery (Silica)

2 Mtpa raw silica slurry transport pipeline and pumping system. Project including slurry mixing and
storage primary and secondary slurry pumping stations and 6 kilometre slurry pipeline as well as
return water pipeline and pumping system.

bar

BHP Cannington

Design of paste fill conveyor including belt rotation system. The conveyor is specifically designed
to minimise segregation of the cement strengthened paste fill material. The structure is elevated
above 1 in 100 year flood levels to meet environmental constraints.

bar


Other Projects of Interest: